Client: Bikaji Foods, Bikaner
- Project cost: 140 Cr. (Appx)
- Total built up area: 5.5 lakh Sq. ft.
- Project Duration: 2 Years
- Project highlights:
- 16 snacks lines (Phase I) with throughput planned for 480 TPD
- Plant designed to meet US FDA and Global food safety – BRC Standards
- Scope involved in equipment selection, process engineering, layouting, utility designing
- 1 Cr.Kcal thermic fluid heaters, 4 MvA installed power,
100% DG backup - HVAC – 1000 TR of Air conditioning with RH control in packaging areas, 2 stage cooling (over 2 L CFM) systems rest of the areas.
Client: Haldirams, Nagpur
- Project cost: 80 Cr. (Appx)
- Total built up area: 3.5 lakh Sq. ft.
- Project Duration: 1.5 Years
- Project highlights:
- Multiple lines with throughput planned for 300+ TPD
- Plant designed to meet Global food safety standards
- Involved in process automation, utility designing and commissioning
- 2.5 Cr. Kcal thermic fluid heaters
- HVAC using waste heat in VAM chillers for Air conditioning with RH control in packaging areas
- Packaging automation with robotic palletization and ASAS for @8000 pallets locations
Client: Global Gourmet
- Global benchmark in Global Frozen food business
- Designing of the factory as per international standards / legislations, customer requirements and COPs – equipment selection, lay outing
- Equipped with state-of-the-art infrastructure and latest processing technology
- Got the US FDA approval, EU, BRC Certification (A) with-in 3 months of commissioning. Currently certified for A+
- Got approval from the TESCO-UK, – one of the first Indian company to get so for frozen in 3P – currently Tesco Blue Certified
- Got approval from other customers like Trader Joes, Pillsbury, Brakes Brothers.
Client: Everest Spices, Mumbai
- Project cost: 80 Cr. (Appx)
- Total built up area: 1.2 lakh Sq. ft.
- Project Duration: 2.0 Years
- Project highlights:
- Production capacity – 100 MT/day of blended Spices
- Involved in technology selection, plant design, utility designing
- State-of-the-art infrastructure – Grinding, blending and automatic recipe management
- Facility made to comply with international standards & productivity
- High speed packaging lines, cryogenic grinding of high quality spices
Client: Everest Spices, Umergaon, Gujarat
- Project cost: 120 Cr. (Appx)
- Total built up area: 2.5 lakh Sq. ft.
- Project Duration: 1.5 Years
- Project highlights:
- Infrastructure designed for 400 MT/day blended Spices
- Design objective is major reduction in man power
- Involved in process engineering, technology selection, utility engineering, project management
- High throughput grinding lines with recipe automation, testing lab
- Automatic storage & retrieval systems (ASRS) for raw materials for 2000 pallet & finished goods, packaging materials for 9000 pallet locations